Approach Installation

Approach

A condition of subdivision approval always includes the construction/upgrade of an approach into the lot (parcel) being created and the remainder of the parcel. Approaches require 2 inspections from County personnel. The 1st inspection is a pre-site (prior to construction). The 2nd inspection is once the approach has been constructed. The cost of an approach inspection is $100 per approach per inspection.